A master bathroom remodel involves more trades per square foot than almost any other home improvement project. Following an orderly phase-by-phase checklist prevents costly rework, failed municipal inspections, and hidden moisture damage.
\n\nPhase 1: Preconstruction & Permitting
\n- \n
- Confirm layout drawings with precise centerline dimensions for plumbing rough-ins (dual vanity sinks, toilet flange clearance, shower valve). \n
- Submit permit applications to the local city building department (plumbing permit for valve/drain work, electrical permit for lighting/GFCI circuits). \n
- Order long-lead specialty items early (freestanding soaking tub, thermostatic shower valves, custom vanity, custom tile). \n
Phase 2: Demolition & Rough Mechanicals
\n- \n
- Inspect subfloor and framing for water rot or termite damage around the old toilet and tub. \n
- Upsize shower drain to 2-inch PVC with proper slope to main stack. \n
- Install dedicated 20-amp electrical circuits for vanity receptacles and heated towel bars. \n
- Install blocking in wall studs for shower grab bars, heavy glass hinges, and vanity hanging cleats. \n
Phase 3: Waterproofing & Inspections
\n- \n
- Pass city rough plumbing and electrical inspections before closing wall cavities. \n
- Install cementitious backer unit (CBU) or waterproof foam board with sealed seams. \n
- Execute a mandatory 24-hour shower pan flood test to verify leak-free pan integrity. \n