Modern Texas households with dual AC compressors, induction cooktops, swimming pools, and electric vehicles easily overwhelm legacy 100-amp electrical services.
Steps for a Permitted Texas Panel Upgrade
- Load Calculation: Master electrician calculates total connected demand under NEC Article 220.
- City Permit & Utility Coordination: Coordinate with local power provider (Oncor, CenterPoint, Austin Energy, CPS) to pull the meter and disconnect service drop.
- Grounding Electrodes: Drive two 8-foot copper-clad grounding rods spaced at least 6 feet apart bonded to continuous 4-gauge copper ground.